News releases Feb. 6, 2019
ExxonMobil announces two new discoveries offshore Guyana
News releases Feb. 6, 2019
selected item
- Eleventh and 12th discoveries made at Tilapia-1 and Haimara-1 wells in southeast section of Stabroek Block
- Adds to recently updated estimate of the discovered recoverable resource to more than 5 billion oil-equivalent barrels
- Growing Turbot area offers significant development potential; baseline 4-D seismic in progress
The discoveries build on the previously announced estimated recoverable resource of more than 5 billion oil-equivalent barrels on the Stabroek block.
Tilapia-1 is the fourth discovery in the Turbot area that includes the Turbot, Longtail and Pluma discoveries. Tilapia-1 encountered approximately 305 feet (93 meters) of high-quality oil-bearing sandstone reservoir and was drilled to a depth of 18,786 feet (5,726 meters) in 5,850 feet (1,783 meters) of water. The well is located approximately 3.4 miles (5.5 kilometers) west of the Longtail-1 well.
The Noble Tom Madden drillship began drilling the well on Jan. 7 and will next drill the Yellowtail-1 well, approximately six miles (10 kilometers) west of Tilapia-1 in the Turbot area. Baseline 4-D seismic data acquisition is underway.
“We see a lot of development potential in the Turbot area and continue to prioritize exploration of high-potential prospects here,” said Steve Greenlee, president of ExxonMobil Exploration Company. “We expect this area to progress to a major development hub providing substantial value to Guyana, our partners and ExxonMobil.”
The other discovery was at the Haimara-1 well, which encountered approximately 207 feet (63 meters) of high-quality, gas-condensate bearing sandstone reservoir. The well was drilled to a depth of 18,289 feet (5,575 meters) in 4,590 feet (1,399 meters) of water. It is located approximately 19 miles (31 kilometers) east of the Pluma-1 discovery and is a potential new area for development. The Stena Carron drillship began drilling the well on Jan. 3 and will next return to the Longtail discovery to complete a well test.
There is potential for at least five floating, production storage and offloading vessels (FPSO) on the Stabroek Block producing more than 750,000 barrels of oil per day by 2025. The Liza Phase 1 development is progressing on schedule and is expected to begin producing up to 120,000 barrels of oil per day in early 2020, utilizing the Liza Destiny FPSO.
Liza Phase 2 is expected to startup by mid-2022. Pending government and regulatory approvals, sanctioning is expected in the first quarter of 2019 for the project, which will use a second FPSO designed to produce up to 220,000 barrels per day. Sanctioning of a third development, Payara, is also expected in 2019, and startup is expected as early as 2023.
The Stabroek Block is 6.6 million acres (26,800 square kilometers). ExxonMobil affiliate Esso Exploration and Production Guyana Limited is operator and holds 45 percent interest in the Stabroek Block. Hess Guyana Exploration Ltd. holds 30 percent interest and CNOOC Petroleum Guyana Limited, a wholly-owned subsidiary of CNOOC Limited, holds 25 percent interest.
About ExxonMobil
ExxonMobil, the largest publicly traded international energy company, uses technology and innovation to help meet the world’s growing energy needs. ExxonMobil holds an industry-leading inventory of resources, is one of the largest refiners and marketers of petroleum products, and its chemical company is one of the largest in the world. For more information, visit www.exxonmobil.com or follow us on Twitter www.twitter.com/exxonmobil.
Cautionary Statement: Statements of future events or conditions in this release are forward-looking statements. Actual future results, including project plans and schedules, resource recoveries and production rates could differ materially due to changes in market conditions affecting the oil and gas industry or long-term oil and gas price levels; political or regulatory developments including the grant of necessary approvals; reservoir performance; the outcome of future exploration and development efforts; technical or operating factors; the outcome of future commercial negotiations; and other factors cited under the caption “Factors Affecting Future Results” on the Investors page of our website at www.exxonmobil.com. References to recoverable resource, oil-equivalent barrels and similar terms include quantities that are not yet classified as proved reserves under SEC rules but are expected ultimately to be moved into the proved reserve category and produced in the future.
Public company information: NYSE:XOM
Contact: ExxonMobil Media Relations, +1 972-940-6007